#pulsarinsights: Drilling is underway at Jetstream #1
0
562
1
0
The well will be drilled to 2,200 feet (671 meters), on reaching target depth, an open-hole logging suite will be acquired to evaluate the reservoir zone for the next phase of the project. Our Capstar rig #314 is a 6000 Elenburg Manufacturing trailer-mounted drilling rig.
Klicke, um diesen Beitrag zu bewerten!
[Gesamt: 0 Durchschnitt: 0]
Um eine Bewertung abzugeben müssen Sie angemeldet sein